construction
concrete step barrier introduction videohighways agency policy websitehighways agency policy statementARUP statement

finishing works

crack cuttingConcrete barrier should require little finishing work. Minor blemishes should be made good with hand tools and a spray-on cure compound applied.

 

Crack control cuts are to be sawn as soon as practicably possible into the hardened barrier at 3 metre centres to limit the formation of uninduced cracks. These cuts do not require sealing.